Skip to main content

Storm Water and Environmental Solutions West Coast Storm Screen Connector Pipe Screen (CPS) Equipment Design and Specification Report . Storm Water and Environmental Solutions Page 2 of 41 654 South Lincoln Avenue, San Bernardino, CA 92408 ~ Telephone 909.890.5700 Facsimile 909.890.5988

the storm water drains into a municipal separate storm sewer systems (MS4). All proposed ... OCTA will release M2 funds directly to the lead agency, where the distribution of the funds among the agencies will occur as defined by their joint agreement. 13. What type of funding can be used for the local match?

(Monthly, post storm post -landslide post-earthquake) 5. 204.50; Linda Lane - Stable beach but narrow. Riprap condition and beach erosion (Semi-Annually, Post Storm) 6. 206.10; Calafia State Beach - upland erosion sand deposits on tracks. Effectiveness of culvert replacement (Post Storm, King Tides) 7. 206.70 – 207.25; Cyprus Shore to County Line

Construction Activities. The Orange County Transportation Authority, which owns the track through San Clemente, worked with Metrolink, which operates regional passenger rail service, to build a 200-foot-long wall at Mariposa Point, to safely re-establish rail service after a Jan. 24 landslide on private property above the track littered the rail line with soil and debris, halting passenger ...

(Monthly, post storm post -landslide post-earthquake) 5. 204.50: Linda Lane - Stable beach but narrow. Riprap condition and beach erosion (Semi-Annually, Post Storm) 6: 206.10. Calafia State Beach - upland erosion sand deposits on tracks: Effectiveness of culvert replacement (Post Storm, King Tides) 7. 206.70 – 207.25: Cyprus Shore to County Line

The immediate goal is to address the areas identified in need of reinforcement as soon as possible before the next storm season arrives. OCTA will continue to work with local, state and federal partners and explore all funding options. Rough estimates on the updated potential solutions range from approximately $210 million to $340 million ...

FOR IMMEDIATE RELEASE: May 1 , 2025 . San Clemente Rail Closure Update: Thursday, May 1. ... and storm surges. Over the past four years, San Clemente’s eroding bluffs – on both city and private property – have repeatedly forced the closure of the rail line that has operated largely uninterrupted for

Staff is planning to release a call for projects in 2023. 12. ... storm, and non- storm water discharges. Transportation-related activities are associated with the operation, construction, and maintenance of public roads, highways, and other ground transportation systems.

Phone (714) 560-OCTA (6282) Business Hours Monday - Friday 8:00 a.m. - 5:00 p.m. Street Address 550 S. Main Street Orange, CA 92868

(Semi-Annually, Post Storm) 4 204.00 –204.30 Mariposa Pedestrian Bridge Install sensors to monitor potential track-bed movement (Monthly, post storm post-landslide post-earthquake) 5 204.50 Linda Lane - Stable beach but narrow Riprap condition and beach erosion (Semi-Annually, Post Storm) 6 206.10 Calafia State Beach - upland erosion