Nighttime Closures Week of Mar. 25, 2024 Date 3/25/2024 3/26/2024 3/27/2024 3/28/2024 3/29/2024 3/30/2024 3/31/2024 I-5 Lane Reductions/Closures
3.0 3.5 4.0 Injury Rate (per MVM) Before After 68% Reduction 1 injury every 9 days (41 per yr) 1 injury every 30 days (12 per yr) Before/after studies: 2. Injury rate Designing for Pedestrian Safety – Road Diets . Pedestrian Safety Education Strategies 7-39 . Who Needs Educational Messages? Pedestrians – all
3 Envisioning the Future During the 1980s, Orange County’s economy boomed and its population grew. County transportation and elected officials envisioned an expanded transportation system that would sustain economic growth and ensure future mobility. Without delay, a long-range transportation improvement plan was developed that would keep
1518 West Taft Avenue Orange, CA 92865 Office (714) 974-8300 Toll free (888) 497-0700 Branch Offices West Sacramento - Morro Bay - Inland Empire – San Diego
Local, state and federal officials gathered on March 7 to commemorate the launch of the SR-91 Improvement Project, a significant effort aimed at improving mobility, enhancing safety and overall traffic flow along one of Orange County’s busiest transportation corridors.
4. Re-computed totals and subtotals. C. We obtained Schedule 3 and performed the following procedures: 1. Compared Net Revenues through June 30, 2020 (Column H) and total net revenues (Column I) amounts to Schedule 2, Column D.1 and Column F.1, Net Revenues (Totals), respectively. 2. Recalculated Net Revenues through June 30, 2020 (Column H ...
Nuevo: A partir del martes 3 de septiembre de 2024, de 9:00 P.M. a jueves 5 de septiembre de 2024, de 7:00 A.M., los autobuses de la ruta 38 oeste estarán en desvío en la ciudad de Anaheim debido a trabajo en la carretera. Nuevo: A partir del sábado 7 de septiembre de 2024, de 2:00 A.M. a 11:00 A.M., los autobuses de las rutas 43, 50
4 Track Protection (MP 204.2) • February 2024, landslide movement pushes debris onto tracks, closes pedestrian trail • Project to install catchment wall to protect tracks • Passenger service resumed March 2024 • Project cost: $6 million. Title: 4.16.24 Emergency Coastal Rail Projects Update
DỰ ÁN CẢI THIỆN XA LỘ LIÊN BANG 405 CHIỀU DÀI 16 dặm KHU VỰC Costa Mesa, Fountain Valley, Westminster, Huntington Beach, Garden Grove,
November 27, 2023 . We are pleased to present the Popular Annual Financial Report (PAFR) of the Orange County Transportation Authority (OCTA) for the fiscal year