This project was completed in November 2014. The Orange Freeway (SR- 57) is an integral part of Southern California’s freeway network. In an effort to improve traffic flow, OCTA, in cooperation with the California Department of Transportation, added a general purpose lane to northbound SR- 57 from Katella Avenue in Orange to Lincoln Avenue in Anaheim.
The construction of a pedestrian access to the operations building, located at 4301 West MacArthur Boulevard in Santa Ana, CA.
Xa lộ Orange Freeway (SR- 57) từ Đường Lambert đến Đường Tonner Canyon là tuyến đường xe tải quan trọng và là một phần không thể thiếu trong mạng lưới đường cao tốc Nam California.
ORANGE – The Orange County Transportation Authority is once again rolling out the popular OC Fair Express bus service, giving residents and visitors a low-cost and stress-free way to get to the OC Fair on weekends. The 2025 service begins Saturday, July 19, and continues every Saturday and Sunday through Aug. 17.
The Orange County Transportation Authority (Authority) invites qualified consultants to provide a Regional Synchronization Asset Administration Pilot. The budget for this effort is $80,000 for a two (2)-year initial term.
%PDF-1.6 1 0 obj /Length 2 0 R /Filter /FlateDecode >> stream xœÜ½[¯mK’ ô^Rý‡ –Ö$ï—'dw[ $ƒ€’x µlÚ`Ö¦å~ ÿ¾ã‹ÈKDŽ9O1kÖÙu&vÙk o #22Ffdd\ÜÍÑÿý ÿëßÿÎßð ÿñßþþwÿå ÿ77ú îö/þöo~ÿ» ?ÿçnÁ wûAÏ ¹{è>¶Û7cw ›oOPþGß77 ù? ÿ»ÿùŸÝþ Л¯¦Gs-· öï~ÿ»pûo‰ wûWš©œî!¹^n±Ý½ë9 # Þ¥{ôÈ»]½‡XC~Š/ ß ...
The CA-133 overhead structure and Bee Canyon Channel both pose constraints to how much the yard lead can be raised or lowered (respectively) from the mainline. Existing clearance under the CA-133 structure is approximately 33-feet, which allows for the lead track to begin rising to the elevation needed for the yard.
Contractor needed to provide detailed bus cleaning and pesticide applications services.
Consultant Services to Prepare the Project Report and Environmental Document for the Interstate 5 Improvement Project from San Diego County Line to Avenida Pico
Add bypass ramp for northbound SR- 57 Orangethorpe Avenue off-ramp prior to SR-91, eliminating the need to merge across multiple lanes at the interchange The $790 million project is funded through a combination of federal, state and local sources, including OC Go and excess toll revenue from the 91 Express Lanes.