Skip to main content

The Orange County Transportation Authority (OCTA), in partnership with the California Department of Transportation (Caltrans), is improving State Route 91 (SR-91) from State Route 57 (SR-57) to State Route 55 (SR-55). OCTA and Caltrans are working with the neighboring cities of Anaheim, Orange, Placentia, Fullerton and Yorba Linda.

Offerors are reminded that the proposal submittal date is at or before 2:00 p.m., October 5, 2023. Offerors are advised that no written questions were submitted by the deadline of 5p.m. on September 20, 2023. Offerors are reminded to acknowledge receipt of this Addendum No. 1 in their transmittal letter and Exhibit B, “Price Summary Sheet.”

OVERVIEW Metrolink, in coordination with the Orange County Transportation Authority (OCTA), is proposing to extend 1.2 miles of railroad track in Dana Point. The siding track would be constructed adjacent to the existing main track from near Victoria Boulevard running south and connecting to the main track near the rail crossing at Beach Road.

Bus Service Change Improvements – Efective May 11, 2025 The Bus Service Change Improvements provide a summary of adjustments to OC Bus. To improve service quality and reliability, changes include the extension of Route 553 from ARTIC to Disneyland Resort along Katella Ave. and Harbor Blvd., schedule adjustments to better serve summer beach trafic and minor schedule changes to reduce wait times.

Consultant Services for program management consultant services for both highway and rail programs.

The Serra Siding Extension Project (Project) is proposing to extend the existing siding train track south by 1.2 miles from Victoria Boulevard to Beach Road in the City of Dana Point. The Project would build the infrastructure to enable regular and frequent passenger service every 30 minutes and increase reliability of the Metrolink system by reducing a choke point in south Orange County. This ...

Overview On July 10, 2023, the Orange County Transportation Authority Board of Directors approved a cooperative agreement with the California Department of Transportation to provide right-of-way support services, right-of-way engineering, right-of-way acquisition, and utility relocation for the State Route 55 Improvement Project between Interstate 5 and State Route 91. Board of Directors ...

2. Specific Scope of Services 2.1 TASK 1 – Program Management / Construction Management CONSULTANT shall provide a qualified management team consisting of a Project Manager, Construction Manager/Resident Engineer (CM/RE) and an Assistant RE, and other personnel as required herein this Scope of Work.

Offerors are reminded that the proposal submittal due date is at or before 2:00 p.m., September 25, 2024. Offerors are hereby notified that no written questions were received on or before 2:00 p.m. on September 12, 2024, as stated in the RFP package.

Park and Ride Facilities Park & Ride lots provide a safe, convenient place to park your car so you can transfer to a prior-arranged carpool, vanpool or catch a bus or train. OCTA's Express aus Routes serve most of the Park and Rides below. BREA COSTA MESA FOUNTAIN VALLEY FOUNTAIN VALLEY FULLERTON HUNTINGTON BEACH IRVINE IRVINE IRVINE LAGUNA HILLS LACUNA HILLS LAKE T LAKE T Los ALAMITOS MISSION ...