Eligible Expenditures capital improvement. Construction management and project management cannot exceed 15 percent of the tot l construction costs. Eligible jurisdictions may use in-kind services to meet all or part of the match

Engineering Construction Construction Engineering Bike lanes (striping only, must be on the Master Plan of County-wide Bikeways) Bus Turnouts (resurfacing only, must be on an OCTA route) Portland Concrete Cement (PCC) Bus Pads Replacement of parking lanes, curbs, gutters, catch basins, and minor profile revisions (i.e., curb to curb) as ...

This deliverable includes 13 projects to be delivered through construction by FY 2029-30. Of the 13 projects to be delivered, one has been completed, four are in construction, seven are in various stages of design, and a joint project with the Riverside County Transportation Commission (RCTC) is in environmental revalidation.

The Orange County Transportation Authority, in coordination with Metrolink, is taking emergency action to stabilize the rail line in north San Clemente. The work is necessary to address urgent threats from slope and beach erosion and to protect the community, rail passengers and overall rail operations.

Have under construction no greater length or amount of work than can be prosecuted properly with due regard to the rights of the public. Control temporary noise from construction equipment by using work hour controls and maintenance of muffler systems on machinery as necessary.

Further, this initiative provides a viable means to advance the unimpeded participation of all willing, ready, and able construction contractors and subcontractors, professional architectural and engineering firms, suppliers and truckers, without regard to race, ethnicity, gender, or physical disability to participate in the State’s ...

Mid-year report shows OCTA continues to deliver on promises made to Orange County voters through Measure M ORANGE – The Orange County Transportation Authority is continuing to keep its promises to deliver a balanced and sustainable transportation network for Orange County, pushing through ongoing challenges of the coronavirus (COVID-19) pandemic. That success is demonstrated by the results ...

Construction Updates Crews are making progress in the ongoing emergency work to stabilize the coastal rail line. Contractors will continue to work through early June, from 5 a.m. to 8 p.m., seven days a week. During this time, rail service is suspended through San Clemente.