Skip to main content

$36 million in Measure M funds to repair and upgrade local streets, and ... Orange County’s three Metrolink commuter rail lines grew to more than 3 million and expanded services are on the way. Vehicle volume on the 91 Express Lanes toll road increased 13 percent over the prior fiscal year.

2. TRANSIT-SUPPORTIVE TRANSPORTATION SYSTEMS . 2.1 INTRODUCTION . Transit is one of many modes in the Orange County transportation system, and the parts of this

Work Plans, Rail Compliance, JHA’s, Environmental Plans, Crane & Hoisting Plans, etc.). 21 IFB 5-3922 ADDENDUM NO. 2 ATTACHMENT A. ... TIRE REPAIR BUILDING BUS WASH / BRAKE DYNO BUILDING HYDROGEN STATION IFB 5-3922 ADDENDUM NO. 2 ATTACHMENT A. Summary of Project

0017 Local Transport Auth Meas 7519 M2 EMP Trabuco Rose Gully Repair (construction) 400,000 10 ... 0017 Local Transport Auth Meas 7519 Regional Rail Planning Program Support 110,000 36. FY 2024-25 Approve Buget. FY: FY: FY: project. Engineering. 15. 25. 27.

˜°˛˝˙ˆˆ°ˇ˘ ˆ ˝ ˇ ˛ ˘˛°˝˙ˇ ˙ˆ Fiscal Year 2024-2025 • E˜ective June 16, 2024 Orange County Transportation Authority

& REPAIR: (949) 724-7777 NON-EMERGENCY CITY POLICE: (949) 724-7000 BIKE LOCKER RESERVATIONS: (949) 724-7369 BACKGROUND STATION HIGHLIGHTS The Irvine train station first opened in 1990, and is located near Ada Street and Barranca Parkway. The station serves the Spectrum area of the city and provides connections to several local destinations.

Orange County has more than 7,300 lane miles of streets and roads; many in need of repair and rehabilitation. This sales tax measure will allocate thirty-two percent (32%) of Net Revenues to streets and roads. These funds will help fix potholes, improve intersections, synchronize traffic

%PDF-1.6 %¡³Å× 1 0 obj >/OCProperties >>>/Type/Catalog/MarkInfo >/Lang(en)/Metadata 366 0 R>> endobj 5 0 obj >/ColorSpace >/XObject >/Shading >/ExtGState ...

The Orange County Transportation Authority, which owns the track through San Clemente, worked with Metrolink, which operates regional passenger rail service, to build a 200-foot-long wall at Mariposa Point, to safely re-establish rail service after a Jan. 24 landslide on private property above the track littered the rail line with soil and ...

Placentia Metrolink Rail Station . $34.8: Final Design. Metrolink Improvements: TBD. Planning: Riverside. County: 15/91 Express Lanes Connector . $270: Construction. Eastbound 91 Express Lane Extension : $10. Environmental: SR-71/SR-91 Interchange Improvements . $137: Construction. Improvements East of I-15 : TBD. Environmental: Bi-County. SR ...