Skip to main content

The current plan is to complete the work in one phase over approximately 90 days. Project engineers and geotechnical experts will continually monitor the slope next to the track during construction. In partnership with all rail agencies, a decision will be made when to safely resume passenger rail service.

Break away from your peloton and normal riding routes. Bring your bike on Metrolink for a cycling adventure through the coastal hills to the blue Pacific and back. There are a number of riding trails that you can take from the Irvine Station including a long scenic loop through Laguna Canyon to Pacific Coast Highway and back via Newport Coast Road.

This document discusses de minimis impact determinations for the Orange County (OC) Connect Project ( Project) under Section 4(f) of the Department of Transportation Act of 1966, as amended (49 United States Code [USC] 303).

$138,086,656.00 Interfund Transfer $138,086,656.00 Construction of ARTIC $101,000,000.00 Cost Allocation: $54,695,206.00 M2 RCP Grant Payments $49,800,000.00 Local ...

The Orange County Transportation Authority (OCTA) is seeking insight from qualified firms regarding potential solutions and industry best practices related to the dredging and placement of sand for the coastal rail stabilization priority projects.

To be allowed to bid on the OC Streetcar Construction Contract, bidders must be pre-qualified. The last day to submit pre-qualification packages is December 19, 2017. Date Posted: 8/14/2017 12:00:00 AM Closing Date: 1/31/2018 2:00:00 PM (PST) Contract Administrator: Robert Webb Phone Number: (714) 560-5743 E-Mail: rwebb@octa.net

San Juan Creek Bridge Replacement Project CAC Bike/Ped Subcommittee Sept. 19, 2017

Project Overview Measure M2 Project S, known as Transit Extensions to Metrolink, is providing funding to connect people between a Metrolink station and activity and employment centers throughout the county. Two types of projects are being funded through Project S: fixed-guideways and bus and station vans. Fixed-Guideways OC Streetcar The Santa Ana - Garden Grove Streetcar project will travel ...

Project Overview OCTA, in coordination with Metrolink, upgraded six Metrolink stations in Orange County. Improvements included removal and replacement of aging yellow detectable warning tiles and other directional tiles, as well as restriping of stations platforms. These six stations include: Buena Park Fullerton Orange Santa Ana Laguna Niguel/Mission Viejo San Clemente

In addition to the 405 Express Lanes, the 405 Improvement Project – a centerpiece of OCTA’s Measure M – added one regular lane in each direction, improved interchanges, and rebuilt overpasses with new bike lanes and sidewalks.