Transit Program Metrolink service, station, track and grade crossing safety improvements OC Streetcar underway $144.5 million allocated to expand mobility choices for seniors and persons with disabilities 36 community-based circulators
District 1 & 2 Roundtable Costa Mesa The Tracks at Brea City of Brea Funding Availability
The majority of the track along the LOSSAN rail corridor was originally built in the late 1800s, with passenger and freight service provided by private railroads in varying degrees from that time until the 1970s. In May 1971, Amtrak assumed operation of three daily San Diegan roundtrips between Los Angeles and San Diego.
Background: The rail line was closed through San Clemente the evening of Wednesday, Jan. 24, when a landslide on private property above the city-owned Mariposa Trail Pedestrian Bridge caused major damage to the bridge and scattered debris onto the track.
The proposed Anaheim Canyon Station project, as approved to scope and funding by the Orange County Transportation Authority (OCTA) Board of Directors (Board), is being undertaken to meet current transit demand and to provide for growth requirements through 2035 and beyond. Specifically, OCTA proposes to construct a second station track and platform to allow more than one train to serve the ...
PROJECT OVERVIEW The Anaheim Regional Transportation Intermodal Center (ARTIC) is a major multi-modal transportation hub serving commuters and residents in the City of Anaheim. ARTIC provides various transit connections in addition to OCTA buses and Metrolink trains, such as services from Pacific Surfliner Amtrak, Anaheim Resort Transit (ART), shuttle and charter bus service, taxis, bikes, and ...
This report tracks bus system safety, as measured by vehicle accidents; courtesy, as measured by customer complaints; and reliability, as measured by on-time performance (OTP) and miles between road calls (MBRC). Along with these metrics, industry-standard measurements are tracked to assess OCTA bus operations; these measurements include ridership, productivity, farebox recovery ratio (FRR ...
It will also add more than a half mile of secondary track and will improve two railroad crossings on Tustin Street and on La Palma Avenue. The project is funded through the federal Congestion Mitigation and Air Quality Improvement Program with additional funds from Measure M, Orange County’s half-cent sales tax for transportation improvements.
Transit Royale, is packed full of real-time information that is perfect for OC Bus customers to plan and track their trips then view arrival and departure times.
MP 206.8. Sept. 2022 Rail service halted to allow OCTA to perform track stabilization work to prevent the track from being pushed toward the ocean near MP 206.8. Late April 2023 After 10 days, a slope failure above the tracks near MP 204.6 causes rail service to shut down. June 2023