The track had moved as much as 28 inches between September 2021 and September 2022 because of storm surge and sand erosion on the coastal side and the gradually sliding hillside on the other. Passenger rail service, including Amtrak and Metrolink, was stopped in late September out of an abundance of caution and to allow for the emergency repairs.
Trevor’s at the Tracks Enjoy internationally-inspired cuisine while dining in San Juan Capistrano’s historic train depot built in 1894.
About the Project The Orange County Transportation Authority (OCTA), in coordination with Metrolink, is replacing the railroad bridge over San Juan Creek in the City of San Juan Capistrano to enhance safety and reduce maintenance needs. Once the new bridge is completed and train service is switched over, the existing bridge will be demolished. Construction is expected to be completed in early ...
The Laguna Niguel - San Juan Capistrano Rail Passing Siding Project was completed in November 2020, three months earlier than planned. This project added 1.8 miles of new passing siding track adjacent to the existing main track to reduce delays, increase safety, and provide more reliable rail service.
Railroad Tracks (RB8 and RB9). y of the soil matrix samples collected and analyzed from RB8 and RB9. TPHo was detected in all 4 samples analyzed, ranging from 28 mg/kg to 870 mg/kg, below its commercia
Getting Streetcar Ready Orange County’s first modern streetcar will arrive in Spring 2026 to serve you. Connecting with the rail and bus network, OC Streetcar will offer car-free transportation between Santa Ana, Garden Grove and beyond. To prepare for OC Streetcar system and vehicle testing, followed by revenue service, it’s time to get streetcar ready.
What is the OC Loop? The Orange County (OC) Loop is a vision for 66 miles of seamless connections and an opportunity for people to bike, walk, and connect to some of California’s most scenic beaches and inland reaches. About 88% of the OC Loop is already in place and is used by thousands of people. Currently, nearly 58 miles use existing off-street trails along the San Gabriel River, Coyote ...
Bus Service Change Improvements – Efective May 11, 2025 The Bus Service Change Improvements provide a summary of adjustments to OC Bus. To improve service quality and reliability, changes include the extension of Route 553 from ARTIC to Disneyland Resort along Katella Ave. and Harbor Blvd., schedule adjustments to better serve summer beach trafic and minor schedule changes to reduce wait times.
On behalf of the Los Angeles-San Diego-San Luis Obispo Rail Corridor Agency (LOSSAN Agency), the Orange County Transportation Authority (Authority) invites proposals from qualified consultants to provide program management consultant services.
Effective: June 16, 2024 This document provides information on general policies regarding employment practices, employee benefits, compensation, and salary structure for administrative employees at the Orange County Transportation Authority and was approved by the Orange County Transportation Authority Board of Directors on June 24, 2024.