Skip to main content

As a part of Coastal Rail Resiliency Study, OCTA completed an Initial Assessment that identified four areas requiring immediate action to ensure safe and uninterrupted rail operations through San Clemente.

On March 31, OCTA submitted an Emergency Coastal Development Permit to the California Coastal Commission to expedite work to stabilize four areas most vulnerable to failure above the railroad track through San Clemente.

Issue an emergency design-build procurement for construction of a catchment wall along Mariposa Point, which is planned to include restoration of San Clemente’s popular pedestrian trail, and to build a revetment, seawall, or functionally equivalent structure south of San Clemente State Beach.

OCTA, in coordination with Metrolink and Amtrak Pacific Surfliner, is taking action to protect the only coastal rail link between San Diego and Orange counties, following continued threats from the privately owned bluffs and from coastal erosion and storm surges.

The board unanimously approved a resolution authorizing OCTA CEO Darrell E. Johnson to take all necessary steps to protect a vital stretch of track through San Clemente, where recent landslides, beach erosion and degrading riprap pose a serious threat to the rail line.

Emergency work to stabilize the railroad track in southern San Clemente is progressing. The stabilization work includes installing two rows of ground anchors into bedrock along a 700-foot stretch of hillside next to the train tracks.

The Track Stabilization Project was completed August 2023. The Orange County Transportation Authority, in coordination with Metrolink, has completed emergency work to stabilize the railroad tracks in San Clemente.

As a part of Coastal Rail Resiliency Study, OCTA completed an Initial Assessment that identified four areas requiring immediate action to ensure safe and uninterrupted rail operations through San Clemente. https://www.octa.net/programs-projects/projects/rail-projects/coastal-rail-emergency...

OCTA has updated its potential solutions to address immediate threats to rail service through San Clemente, and sand nourishment – always under consideration – is a key piece in the coastal rail protection puzzle.

The Orange County Transportation Authority, in coordination with Metrolink, is taking emergency action to stabilize the rail line in north San Clemente. The work is necessary to address urgent threats from slope and beach erosion and to protect the community, rail passengers and overall rail operations.