About the Project The Orange County Transportation Authority (OCTA), in coordination with Metrolink, is replacing the railroad bridge over San Juan Creek in the City of San Juan Capistrano to enhance safety
At the same time, travel patterns and transportation needs have continued to evolve since OCTA’s last major transportation study of the area in 2008. The projects from that study have resulted in more than a $1.5 billion investment in the area, including OCTA’s I-5 carpool lane project between San Juan Creek Road and Avenida Pico, and OCTA ...
coach operator and behind-the-wheel trainer. Last month, a driver clipped a cyclist who was subsequently thrown in front of Steve’s bus. Steve’s experience allowed him to safely slow down and maneuver the bus to avoid the fallen cyclist and protect the cyclist from getting hit by other vehicles.
Johnson moderated a panel discussion with Caltrans Director Tony Tavares. The discussion focused on the partnership between OCTA and Caltrans in delivering Orange County’s transportation projects to ensure that taxpayer funds are effectively allocated and efforts to continue investment in workforce development to support infrastructure projects.
LOSSAN Corridorwide Information Assessment 4 Station Site Profiles: San Luis Obispo County San Luis Obispo Score [4] Transportation Connections
Systemwide OTP was 83.2 percent, 0.1 percent higher compared to last quarter. DOFR and CFR both performed above standard as the OTP for DOFR increased by of 0.2 percent while there was no change in the CFR’s OTP. Mode Results for July 2020 through March 2021 Systemwide Fixed-Route Directly-Operated Fixed-Route
Transit support: Enhance the public transit experience, improve first and last/mile connectivity to transit (e.g., via shared mobility) Sustainability: Reduce cars dependency and encourage use of sustainable/zero emissions modes Livability: Ensure safe and secure trips while creating a sense of community.
$*(1'$ (qylurqphqwdo&ohdqxs$oorfdwlrq&rpplwwhh &rpplwwhh0hpehuv 6hswhpehu d p *duu\%urzq &kdlu. 2udqjh&rxqw\7udqvsruwdwlrq $xwkrulw\
Title: OCS Seg 5 Final Paving - 2024-01-19 Author: Derek Keeley Subject: OCS Seg 5 Final Paving - 2024-01-19 Keywords: OCS Seg 5 Final Paving - 2024-01-19
Route 25 Detour Desvío para la ruta 25 Dates: 2/2/2025 Horas/Horas: 4:00 A.M. - 3:00 P.M. ert sajero For more information / para más información: www.octa.net / 714-636-RIDE (7433)