Skip to main content

The Fullerton train station has served as a passenger rail hub since the late 1800s. Located at Harbor Boulevard and Commonwealth Avenue, it is one of Orange County’s 11 train stations. The Fullerton train station serves nearly 3,000 Amtrak and Metrolink passengers daily. From Fullerton, Orange County’s Metrolink

The rail line through San Clemente reopened for all passenger rail service on July 17, as emergency work was completed on a temporary barrier wall to protect the track below the Casa Romantica Cultural Center and Gardens. Metrolink, which operates regional passenger rail service, and its contractors worked in partnership with OCTA to build the ...

Rail Connections. Amtrak Schedules - OC Line Metrolink - IEOC Line Metrolink - OC Line Metrolink - 91/Perris Valley Line Back to Top. Contact OCTA. 550 S. Main Street Orange, CA 92868 (714) 560-6282. Bus Information (714) 636-7433. 91 Express Lanes (800) 600-9191. About octa ...

Turnstiles have been placed at each of the subway and light rail entrances in Los Angeles County as part of the TAP system. Metrolink riders are required to physically tap their tickets at turnstiles and validators when transferring to a Metro Rail line. A TAP-compatible ticket or TAP Card is required to pass through the turnstile.

Metrolink is a regional rail system that stretches from Ventura to Oceanside. Three rail lines serve Orange County’s 11 stations. Last year, 5.1 million passengers rode Metrolink in OC. The average weekday ridership was over 18,000. Over 400,000 rode on weekends. This is our target audience. As our partner, it can be yours, too.

Commuter rail services within the SR-91 corridor are constrained with little room for growth. A two-lane reversible tunnel would accommodate a maximum capacity of 72,000 average daily traffic, with a daily average forecast from 55,000 to 65,000 vehicles per day (vpd). Conclusion

SOUTH COAST RAIL INFRASTRUCTURE FEASIBILITY STUDY ORANGE COUNTY TRANSPORTATION AUTHORITY 550 South Main Street P.O. Box 14184 Orange, CA 92863-1584 (714) 560-6282 Key RFP Dates Issue Date: August 23, 2023 Pre-Proposal Conference Date: August 31, 2023 Question Submittal Date: September 4, 2023 Proposal Submittal Date: September 19, 2023

OCTA's rail safety enhancement program included upgrading and improving safety features at 52 railroad crossings throughout the county. This is the first countywide effort to enhance rail safety in Anaheim, Dana Point, Irvine, Orange, San Clemente, San Juan Capistrano, Santa Ana and Tustin. Countywide improvements feature safety enhancements ...

riding the train more if there were added sta on improvements? 1 to 3 days a week 4 or more days a week Several mes a month 0 to 15 minutes 15 to 30 minutes 30+ minutes Yes Maybe No Yes Maybe No If train service was interrupted due to severe weather, how would you travel instead? What train sta on ameni es would be most helpful