For each Existing and New service proposed, provide a proposed timeline with proposed dates for key Project Readiness activities, including vehicle and operator procurement; any required training, startup testing and marketing activities in anticipation of revenue operations in the opening month/year for all Services identified in Section H tables, above.
Service Optimization: A Focus on Efficiency Metrolink hired a contractor to develop a new, data-driven train schedule.
Funded primarily by Measure M, transportation improvements to our freeways keep commuters and goods moving within Orange County and to destinations beyond. With Orange County’s population projected to increase dramatically by 2030, change is needed today to ensure tomorrow’s mobility. Before freeway construction begins, environmental reports must be approved, projects must be designed and ...
Measure M2 includes competitive capital grant programs for transportation projects, including the countywide Regional Capacity Program (Project O) and the Regional Traffic Signal Synchronization Program (Project P), which focus on improvements to the Master Plan of Arterial Highways. The Comprehensive Transportation Funding Programs guidelines provide the mechanism for the administration of ...
https://octa.legistar.com/Gateway.aspx?M=LD&From=RSS&ID=7419042&GUID=DCC52B27-306C-42B7-BD24-3737D7AFA1E3Legistar15
ORANGE – As crews continue to push ahead on emergency efforts to reinforce the most vulnerable areas along the rail line in San Clemente, the Orange County Transportation Authority received additional approvals from the California Coastal Commission to advance more work.
Provides funding for local transit services that: complement existing regional transit services; and
This report tracks bus system safety, as measured by vehicle accidents; courtesy, as measured by customer complaints; and reliability, as measured by on-time performance (OTP) and miles between road calls (MBRC). Along with these metrics, industry-standard measurements are tracked to assess OCTA bus operations; these measurements include ridership, productivity, farebox recovery ratio (FRR ...
Approve the minutes of the March 3, 2025, Regional Transportation Planning meeting.
9Defined purpose and need (the problem) 9Conducted SR‐57 Extension Concept Study • On‐structure concept eliminated from further study 9Developed and analyzed initial set of alternatives • Eliminated SR‐55 major expansion • Eliminated SR‐57 “on riverbed,” “at‐grade”, “underground” and “arterial” concepts