Skip to main content

South County System Map 500 800 90 LAGUNA OODS 89 OC Bus Rapid Limited Stop Service (500-599) City Shuttle LAKE/ FO EST IRVINE STATION 480 177

Phone (714) 560-OCTA (6282) Business Hours Monday - Friday 8:00 a.m. - 5:00 p.m. Street Address 550 S. Main Street Orange, CA 92868

will operate along a 4.15-mile route that connects the Santa Ana Regional Transportation Center (SARTC) and a new transit hub at Harbor Boulevard and Westminster Avenue in Garden Grove. Through Transit Extensions to Metrolink, a Measure M (now named OC Go), Santa Ana and Garden Grove pioneered the streetcar project.

rane ount Transortation utorit 550 S. Main Street, P.O. Box 14184, Orange, CA 92863-1584 • (714) 560-OCTA www.octa.net 07/28/09 Tustin Metrolink Station

The Community College Pass, a shared-cost program that allows enrolled community-college students to travel free on any OC Bus fixed route, helps students access higher education, employment and recreational opportunities across Orange County. All nine Orange County community colleges participate.

route 55 – northbound stop numbers route route direction bus stop number street of travel cross street city. 55 n 6392 halladay 2929 halladay st sa 55 n 6393 halladay dyer sa 55 n 6394 halladay emmett sa 55 n 6395 halladay central sa 55 n 6758 warner standard sa 55 n 6339 grand warner sa

The Orange County Transportation Authority invites proposals from qualified contractors for the management and operation of Contracted Fixed Route, StationLink, and iShuttle bus services. Instructions:

Take OC Bus Route 167. Earth Day & Arbor Day Celebration. Saturday, April 19 8:30 AM – 11:30 AM Crown Valley Park 29751 Crown Valley Pkwy, Laguna Niguel, CA 92677. Join the Niguel Botanical Preserve and The City of Laguna Niguel for a great day of volunteering! Volunteers are needed to plant, weed, and clean up the preserve.

STATe RouTe 22 PRojecT coST eSTImATeS Date of estimate (Source) Design/construction estimate Scope of Work 1998 (Long Range Trans. Plan) $180 million Add HOV each direction within existing ROW by re-stripping 2001 (Caltrans District 12) $344 million Design-Bid-Build • HOV each direction • Auxiliary lanes • Reconstruct 34 bridges

Solana Beach are the busiest stations of the Pacific Surfliner route, accounting for more than. LOSSAN Business Plan April 2018 iii half of total Pacific Surfliner ridership. On-time performance has fluctuated over the past several years, but continues to be lower than expected, reaching a low of 68.8 percent in FY 2016-17.