Skip to main content

During the past two weeks, OCTA has secured a total of $305 million from state and federal sources to move forward on immediate coastal rail stabilization efforts ORANGE – The Orange County Transportation Authority has secured essential funding this month from state and federal partners that will advance vital enhancements to help stabilize the rail corridor where it runs along the ...

Separate from ongoing emergency repairs in San Clemente reinforcement areas, OCTA is studying options for reinforcing the rail line for approximately the next 30 years and needs public input ORANGE – While the Orange County Transportation Authority continues to lead emergency track protection efforts in priority areas along the rail line in San Clemente, work continues on a study of ...

La Palama Ave Ped only at-grade crossing within a quiet zone Ped only at-grade crossing with a PAWS (Pedestrian Audible Warning System)

The Orange County Transportation Authority (OCTA) and Southern California Regional Rail Authority (SCRRA or Metrolink) are requesting permits and authorization for Areas 1 and 2 of the Critical San Clemente Railroad Protection Project (Project) in San Clemente, Orange County, California. The Project includes improvements along the coastal rail line corridor that focus on maintenance and ...

Passenger rail service is expected to remain suspended until early June. Background: Passenger rail service through San Clemente was suspended beginning April 28 to allow for crews to safely conduct emergency work to reinforce sections of track at immediate risk from landslides and coastal erosion.

This project was completed in 2014. The Sand Canyon Avenue Undercrossing project along the LOSSAN rail corridor between Interstate 5 and Oak Canyon/Laguna Canyon Road in Irvine opened to motorists on July 14, 2014. The project lowered Sand Canyon Avenue under the railroad tracks and widened the roadway from four to six lanes.

4/14/ 2025 Effort advances critical action to safeguard Southern California’s rail connection and public safety. ORANGE – The Orange County Transportation Authority Board of Directors on Monday authorized emergency actions to stabilize sections of railroad track threatened by coastal erosion and landslides in San Clemente, moving forward ...

Coastal Rail Stabilization Requires Emergency Action Permit to the California Coastal Commission to expedite work to stabilize four areas most vulnerable to failure above the railroad track through San Clemente.

Public Transportation: Supporting future expansion of the Metrolink system serving Irvine and all of Orange County by meeting rail vehicle servicing and storage needs. Allowing for more frequent passenger rail service and reducing operating costs by eliminating the daily need to move trains to less convenient facilities.

OCTA is conducting a Coastal Rail Resiliency Study (CRRS) to develop short to medium-term solutions to protect the coastal railroad in its current right-of-way (ROW) and alignment.