Plans, Specifications, and Estimates for State Route 91 between State Route 55 and Lakeview (Segment 1)
Performance: OC Bus 360°Reductions Average Weekday PRODUCTIVITY – System vs. OC Bus 360° Route Reductions/Eliminations To Date
BEACH BLVD Beach Boulevard Corridor Study Outreach and Survey Results
Please provide a complete description of this request. To facilitate engineering support for payment review, this involves Engineering support A, which is currently assisting an agreement with Zimmerman Engineering.
As part of the Beach Boulevard Corridor Study (Project), an initial list of corridor-wide improvement concepts was prepared. Three of the toolbox elements (transit-only lane, protected bicycle lane and on-street parking/loading with wider sidewalks) would require the reduction in the number of travel lanes on Beach Boulevard. In order to determine whether lanes could be removed on Beach ...
Introduction The I-5 Improvement Project proposes to increase person and vehicle throughput on I-5 between the San Diego County Line (11-SD-5, PM 71.0) and the I-5/Avenida Pico Interchange (12-ORA-5, PM 3.4) in the city of San Clemente and unincorporated San Diego County. The Proposed Project would add a high-occupancy vehicle (HOV) lane in both directions along this 3.5 mile stretch of I-5 ...
1 5 I I 3 4 I V 30 V II 2 0 I 3 I I 3 1 I 5 I 2 0 * I 8 I 2 7 V 4 0 * 1 0 * 4 I 9 I 8 V 1 I 2 0 I 7 35 IV 7 I 4 * 1 0 I 4 1 V 2 9 2 4 I 3 6 I 5 2 I I 1 2 I I 3 3 I 2 ...
Focus on attracting and retaining riders High‐quality, spontaneous use network
Ms. Alacar stated that the total call capacity would be $ 71.6 million including the additional funding from the cancelled projects assuming the six projects that had applied for reapplication are granted and approved by the Board.
Department / Fund Name Obj Line Item Description Budget Org- Key Page No.