Efforts to improve transit service will continue through OC Bus 360°, the agency’s comprehensive effort aimed at reshaping transit service throughout the county. Bus service levels are proposed to increase by 1.4 percent to account for the first full year of Bravo! Route 529 and no fare increase is proposed. Also included in the FY 2019-20 budget is $219.8 million for the purchase of ...
Background The primary goal of these guidelines is to ensure consistent field data collection and reporting procedures so that countywide funding allocations can be based on agency comparable pavement conditions.
For construction management, project management and final design (for Project X Tier 1 projects only), combined costs cannot exceed 15 percent (15%) of total construction cost.
California Environmental Quality Act Enacted 1970 to ensure state and local agencies consider the environmental impact of their decisions when approving a public or private project.
The recommended improvements are consistent with those being constructed under the current grade crossing safety enhancement program. It is SCRRA’s policy to upgrade grade crossings to current standards when other grade crossing modifications are performed.
Total construction in progress decreased by $5,769,841 as a result of the Toll Collection Site and back office system placed into service in current fiscal year. More detailed information about the 91 EL’s capital assets is presented in note 5 to the financial statements.
The Bicycle Corridor Improvement Program (BCIP) is funded using the federal Congestion Mitigation and Air Quality Improvement Program (CMAQ) authorized under Moving Ahead for Progress in the 21st Century (MAP-21) and the Fixing America’s Surface Transportation (FAST). The CMAQ program provides funding through annual appropriations to Orange County to be used for transportation-related ...
South Orange County Rail Station Feasibility StudySolicitation Number:
PURPOSE AND AUTHORITY The Bicycle Corridor Improvement (BCI) Program is funded using federal Congestion Mitigation and Air Quality (CMAQ) funds, first authorized under the Intermodal Surface Transportation Efficiency Act (ISTEA) of 1991 and subsequently reauthorized under the Transportation Equity Act for the 21st Century (TEA-21) in 1998, and the Safe, Accountable, Flexible, Efficient ...
Preliminary Engineering and Environmental Services for the Metrolink Orange County Maintenance Facility