At the same time, the Orange County Transportation Authority, which is leading the project, is working to source 240,000 cubic yards of sand as part of the project that will be placed in Areas 1 and 2 north of Mariposa Point.

Click on a solicitation below to view its Planholders List Report

The Sand Canyon Avenue Grade Separation, a $64 million project that lowered Sand Canyon Avenue under the railroad tracks and widened the roadway, won the award in the bridge category. The newly constructed bridge opened to motorists in July 2014 and improved safety and mobility for the traveling public.

*OCTA is participating in discussions about a sand replenishment program with the County of Orange and other stakeholders to protect the railroad and other infrastructure.

The sand, fuel, and lubricating fluids used at the facility are all in a designed sealed system. SCAQMD regulates overall regional air quality based on specific criteria pollutants including Ozone, Particulate Matter, Carbon Monoxide, Oxides of Nitrogen, Oxides of Sulfur, Lead, and Volatile Organic Compounds (VOCs).

*OCTA is participating in discussions about a sand replenishment program with the County of Orange and other stakeholders to protect the railroad and other infrastructure.

Approximately 60,000 to Sand nourishment to create approximately 77,000 tons of rock 80 to 100-foot-wide beach between MP 206.00 and 206.67 Approximately 240,000 to 300,000 cubic yards of sand

Sand Canyon Undercrossing This project was completed in 2014. The Sand Canyon Avenue Undercrossing project along the LOSSAN rail corridor between Interstate 5 and Oak Canyon/Laguna Canyon Road in Irvine opened to motorists on July 14, 2014. The project lowered Sand Canyon Avenue under the railroad tracks and widened the roadway from four to six ...

(1) Project 1: Cities of Santa Ana/Garden Grove Fixed Guideway Project

The Environmental Review Process The I-405 (SR-55 to I-5) Improvement Project is currently in the Project Approval and Environmental Document (PA/ED) Phase, commonly referred to as the environmental study process. As mandated by the California Environmental Quality Act (CEQA) and National Environmental Policy Act (NEPA), an Initial Study and Environmental Assessment (IS/EA) environmental ...