Skip to main content

The Board of Directors has suspended work on The CenterLine Light Rail Project and directed staff to explore bus rapid transit and other modes and options. As a result, public outreach resources are being refocused.

Construction began on the SR-55 (I-405 to I-5) Improvement Project last week to improve mobility along one of the most heavily congested freeways in Southern California. SR-55 is a vital link to other major freeway systems in Orange County and is the only freeway providing a direct north-south connection between Central Orange County and the coastal region. The contractor is restriping lanes ...

The Orange train station, also known as the Orange Santa Fe Depot, has served as a pas-senger rail hub since the late 1800s. The station building, built in 1938, is recognized as one of Orange’s historic landmarks. Approximately 750 Metrolink passengers board from the Orange Station each weekday. From Orange, Orange County’s Metrolink service offers local residents an alternative way to ...

Service Animal Definition - DOT ADA regulations at 49 C.F.R. Section 37.3 ”Service animal means any guide dog, signal dog, or other animal individually trained to work or perform tasks for an individual with a disability, including, but not limited to, guiding individuals with impaired vision, alerting individuals with impaired hearing to intruders or sounds, providing minimal protection or ...

Construction Activities The Orange County Transportation Authority, which owns the track through San Clemente, worked with Metrolink, which operates regional passenger rail service, to build a 200-foot-long wall at Mariposa Point, to safely re-establish rail service after a Jan. 24 landslide on private property above the track littered the rail line with soil and debris, halting passenger ...

1.0 Overview The Measure M2 (M2) Project U – Senior Mobility Program (SMP) provides funding to support local, community-based transportation service for seniors. Originally established in 2001 using limited state funding for bus operations, M2 Project U SMP funding was established to continue and expand the existing program. A formula funding allocation was established for all Orange County ...

RFP 4-2467: “ON-CALL MATERIALS TESTING AND INSPECTION SERVICES FOR OCTA FACILITIES”

7. Provide up to $575 million in M2 and external funding (includes $58 million in local match funds) to implement Board‐selected fixed‐guideway projects. Based on the level of interest from local jurisdictions, additional funds will be available for proposed/future local jurisdiction projects for bus and van connections to Metrolink. (M2 project S)

The OC Streetcar will be Orange County’s first modern electric streetcar, running along a 4.1-mile route between the Santa Ana Regional Transportation Center and Harbor Boulevard in Garden Grove. The project will provide an additional affordable and convenient transit option, connecting with several of the busiest OC Bus routes and Metrolink commuter rail, in one of the nation’s most ...

BUS & LOCAL TRANSIT • 4 bus routes serving Laguna Woods’ 29 bus stops • More than 91,100 bus boardings in FY 2023-24 • Senior Mobility Program - Community Transportation BICYCLE / PEDESTRIAN • El Toro Road/Aliso Creek Road Bikeway and Sidewalk Enhancement • Orange County Bikeway Connectors Study REGIONAL PROGRAMS