Skip to main content

2023 Congestion Management Program 4 Chapter 1: Introduction The passage of AB 2419 (Chapter 293, Statutes of 1996), in July 1996, provided local

During his seven months as interim Managing Director, Jewell helped navigate and communicate the potential impacts of a threatened national rail strike and managed through an emergency rail closure in San Clemente, where construction is underway to stabilize track threatened by sand erosion and a slowly sliding hillside next to the track.

This summer, Orange County is packed with festivals and other enjoyable activities easily reached by train. To encourage Orange County residents and visitors to take Metrolink, OCTA showcases these special events near Metrolink stations and offers opportunities to win free tickets and gift cards.

segments of the LOSSAN rail corridor are limited by the lack of passing or second main tracks. In San Diego County, 33 percent of the corridor is comprised of a single main line track, while 80 percent of the LOSSAN rail corridor north of Los Angeles is currently single track. The 2012 LOSSAN Strategic Implementation

Public transit's first fully integrated communication, operation, and maintenance system.

Welcome. Customers may drive the entire length or enter or exit at the county line near Green River Road. The toll for a partial and full trip is posted on the on-road pricing signs and on toll schedules.. The 91 Express Lanes uses congestion management pricing to adjust tolls quarterly based on the number of vehicles.

the railroad bridge over San Juan Creek in the City of San Juan Capistrano to enhance safety and reduce maintenance needs. Once the new bridge is completed and train service is switched over, the existing bridge will be demolished. Construction is expected to be completed in early 2027. Haga clic aquí para ver esta informacíon en español.

A committee member commented that the right-of-way in that corridor is single track and asked if the new bridge supports double tracks. Chris Boucly responded the new bridge would support double tracks if the decision is made to add tracks. 8. Update Reports Government Affairs – Clara Brotcke, Government Relations, presented the update.

OCTA will reconstruct Lakeview Avenue to allow vehicles to pass over the BNSF Railway tracks. As part of the project, Lakeview Avenue will be raised to separate car traffic from train traffic. ... These bridges will eliminate the need for commuters and commercial vehicles to stop and wait at railroad crossings as freight trains pass. Every day ...

"Report Created 5/31/2025 6:29:39 PM",,, "PLANHOLDERS LIST",,, "SOLICITATION 54047: Dredging and Placement of Sand for the Coastal Rail Stabilization Priority ...