Skip to main content
250 results for "stabilize"

What is the Track Stabilization Project? It is an emergency project to stabilize the railroad tracks in south San Clemente. The Orange County. Transportation ...

The work is projected to include approximately 95% sand and 5% rock reinforcement, known as riprap, only to be placed where needed to stabilize the slope and ...

Oct 19, 2022 ... Recently, OCTA finalized a contract with a geo-technical firm to begin emergency work to stabilize the railroad track through southern San ...

Apr 19, 2023 ... ... stabilize the tracks in south San Clemente. The work involved drilling large steel 130-foot-long ground anchors into the bedrock of the ...

Nov 15, 2022 ... o Passenger train service suspended to stabilize tracks o Placed +18,000 tons of riprap along 700 feet of track (counteracts mass of slide).

The Orange County Transportation Authority (OCTA), in coordination with Metrolink, is taking emergency action to stabilize the rail line in north San Clemente.

Mar 31, 2025 ... Rail Stabilization Priority Projects in Orange County. Background: OCTA is conducting a Coastal Rail Resiliency Study (CRRS) to develop ...

Feb 11, 2025 ... The OCTA Board of Directors on Monday (Feb. 10) voted to advance four priority projects under the Coastal Rail Stabilization Priority Project.

Mar 8, 2023 ... As OCTA nears completion on emergency work to stabilize railroad ... “When we began the emergency stabilization effort, it was clear ...

The Orange County Transportation Authority (OCTA), in coordination with Metrolink, is taking emergency action to stabilize the rail line in north San Clemente.