Since late September, Metrolink service has been temporarily suspended in Orange County between Laguna Niguel and Oceanside for track stabilization. Starting Saturday, Oct. 29, however, Metrolink weekend trains along the Orange County and Inland Empire-Orange County lines will resume service to and from the San Juan Capistrano, San Clemente, and San Clemente Pier stations. Weekday service is ...
53 A partir del lunes 16 de agosto de 2024, la ruta 53 norte que sale a las 2:48 p.m. se ajustará para salir a las 2:43 p.m. Nuevo: A partir del viernes 11 de octubre de 2024, de 6:00 P.M. a 529 9:30 P.M., los autobuses de la ruta 529 sur estarán en desvío en la ciudad de Buena Park debido a el evento Knott's Scary Farm.
A quiet zone is a section of rail line at least one half mile in length containing one or more consecutive public highway-rail grade crossings at which locomotive horns are not routinely sounded. Routine sounding can be silenced at specific highway-rail grade crossings after a safety system or procedure established by the appropriate traffic control authority is determined, by the Federal ...
Requirements due by Monday, June 30th Eligibility Checklist Capital Improvement Program (CIP)* Circulation Element/MPAH Consistency*
Bus Service Change Improvements – Efective May 11, 2025 The Bus Service Change Improvements provide a summary of adjustments to OC Bus. To improve service quality and reliability, changes include the extension of Route 553 from ARTIC to Disneyland Resort along Katella Ave. and Harbor Blvd., schedule adjustments to better serve summer beach trafic and minor schedule changes to reduce wait times.
WAIT YOUR TURN Stop behind lowered crossing gates or when red lights are flashing, look both ways.
It is an emergency project to stabilize the railroad tracks in south San Clemente. The Orange County Transportation Authority, in coordination with Metrolink, has completed installation of ground anchors into a slope adjacent to the Cyprus Shore community. Passenger train service through the area was suspended in October 2022, and freight train service was reduced.
Phase 3 survey respondents further prioritized the various proposed strategies developed from participant feedback gathered in Phases 1 and 2 of the study to improve future transportation and mobility challenges within south Orange County.
The contract awarded for project design and construction is $1. 2 billion. The project is the first in the state being built using the design-build authority provided under Assembly Bill 401 by Assemblyman Tom Daly, passed in 2013.
FY 2013-14 9/4/13 11/19/13 1/17/14 3/11/14 5/15/14 6/30/14