Skip to main content

Background: Passenger rail service through San Clemente was suspended beginning April 28 to allow for crews to safely conduct emergency work to reinforce sections of track at immediate risk from landslides and coastal erosion. The rail line was expected to be shut down for passenger service for a total of approximately six weeks and is now opening a few days ahead of the initial schedule. OCTA ...

Bus Service Change Improvements – Efective May 11, 2025 The Bus Service Change Improvements provide a summary of adjustments to OC Bus. To improve service quality and reliability, changes include the extension of Route 553 from ARTIC to Disneyland Resort along Katella Ave. and Harbor Blvd., schedule adjustments to better serve summer beach trafic and minor schedule changes to reduce wait times.

Orange County Transportation Authority Page 1 of 1 Printed on 7/30/2025 powered by LegistarTM

That includes accelerated construction on several major projects led by the Orange County Transportation Authority, including the $1.9 billion I-405 Improvement Project on 16 miles between Costa Mesa and the border with Los Angeles County, the 4.1-mile OC Streetcar in Santa Ana and Garden Grove, and improvements along Interstate 5 in south and central Orange County.

NOTES: * Figures show lane difference between MPAH classification and constructed lanes. Red label indicates roadway segment is underbuilt to MPAH classification. Black label indicates overbuilt segments. ** Unconstructed roadway alignments may not be finalized. * M o rel ans id c th . Freeways / Toll Roads shown for reference purposes only.

Bus Service Change Improvements – Efective May 11, 2025 The Bus Service Change Improvements provide a summary of adjustments to OC Bus. To improve service quality and reliability, changes include the extension of Route 553 from ARTIC to Disneyland Resort along Katella Ave. and Harbor Blvd., schedule adjustments to better serve summer beach trafic and minor schedule changes to reduce wait times.