Skip to main content

Agenda Descriptions: The Agenda descriptions are intended to give notice to members of the public of a general summary of items of business to be transacted or discussed. Public Comments: At this time, members of the public may address the Taxpayer Oversight Committee (TOC) regarding any items within the subject matter jurisdiction of the TOC, provided that no action may be taken on off-agenda ...

The passage of AB 2419 (Chapter 293, Statutes of 1996), in July 1996, provided local agencies the option to elect out of the CMP process without the risk of losing state transportation funding. However, local jurisdictions in Orange County expressed a desire to continue the existing CMP process, because the requirements were similar to those of the Orange County Measure M Growth Management ...

• Carry-on items must stay off wheel wells unless attended and held at all times. • Passengers with strollers must remove child, collapse the stroller and stay seated with children in their laps at all times.

The rapid streetcar can be thought of as a hybrid of streetcar and light rail, and may be appropriate in very specific contexts. The western segment of the OC Streetcar between Santa Ana and Garden Grove, which will operate in an off-street right-of-way with widely spaced stops, fits the definition of rapid streetcar.

Residen al Groups Listening Session Wednesday, April 03, 2024 See the table below to view ques ons and comments submited through the Q&A.

Add one general purpose lane in both directions from Yale Avenue to State Route 55 Widen bridges, extend drainage culverts and construct soundwalls Realign and improve the existing on- and off-ramps. Rehabilitate/construct pavement, construct safety device upgrades, census stations, additional signage, electrical conduit replacements Re-establish existing auxiliary lanes and provide new ...

INTRODUCTION Major Corridors are those routes with the strongest existing transit markets. Appendix A includes detailed route profiles for 17 Major Corridors. These profiles help to provide a better understanding of the strengths and weaknesses of existing services, identifying opportunities for future transit investments. This introduction describes the contents, data sources, and purpose of ...

All trip purposes are then segmented into peak and off-peak time periods, with the exception of home-based work-at-home trips, which are excluded from further processing in the model. Prior to trip distribution, the direct and strategic home-based work trip purposes are combined into their respective income categories.

1 INTRODUCTION ABOUT ORANGE COUNTY In 1950, a few years before Interstate 5 was completed and Disneyland opened near one of its off-ramps, citrus groves still covered much of Orange County and the population was just over 200,000 people.

Multiple active scope locations shall require a qualified HSE Representative for each separate worksite location. The Contractor’s designated HSE Representative is a key position and is expected to participate in the initial pre-mobilization kick-off meeting.