Skip to main content

Escape for a beach day in San Clemente where you can plant your umbrella in the sand, roll out your towel and soak up the sun. It is one of our top destinations. Still there’s more to this station than a day at the beach. We’ve created several day trip options including outlet shopping and going for an easy beach cruise to and from the pier.

The rail line was closed through San Clemente the evening of January 24 when a landslide caused major damage to the bridge and scattered debris onto the track. The $7.2 million is in addition to a previous award from the state of $2 million for cleanup and pre-construction activities at the site.

Construction and Maintenance Agreements with BNSF and the City of Placentia for Orangethorpe Avenue and Tustin Avenue/Rose Drive

For some counties, goods movement has meant revenues and good-paying jobs. For Orange County, it primarily means a flood of cargo trucks that saturate, stagnate and steadily deteriorate local roads and freeways on a daily basis. It also means seemingly endless freight trains that cause delays for local commuters and disturbances for communities at all hours of the day and night. And, of course ...

Project Overview The project added 1.8 miles of passing siding railroad track between the Laguna Niguel/Mission Viejo Metrolink Station and Trabuco Creek in San Juan Capistrano. The passing siding track runs adjacent to the existing track, which allows trains traveling in opposite direction to pass each other without stopping. The project reduces delays, increases safety and provides more ...

BRAVO! Limited Stop Service Fullerton to Huntington Beach (BRAVO) 529 (via Beach Blvd.) Rail Stations 29

About the Project The Orange County Transportation Authority (OCTA), in coordination with Metrolink, is replacing the railroad bridge over San Juan Creek in the City of San Juan Capistrano to enhance safety and reduce maintenance needs. Once the new bridge is completed and train service is switched over, the existing bridge will be demolished. Construction is expected to be completed in early ...

Improve safety by removing the existing at-grade railroad crossing Lower 17th Street and Lincoln Avenue to go under the railroad tracks Provide a new railroad bridge and retaining walls with aesthetic treatment Reconfigure access to properties to join the lowered roadways Re-establish sidewalks and landscaping Maintain existing trafic patterns

Background on Measure M2 Measure M2 (M2) is a 30-year, half-cent sales tax for transportation improvements in Orange County, administered by the Orange County Transportation Authority (OCTA). The program was approved by nearly 70% of voters in 2006 and took effect in 2011, following the expiration of the original Measure M (M1), which ran from 1991 to 2011 and generated approximately $4 ...