Skip to main content

committee member asked what is happening with the pedestrian trail. Calina responded that part of the project falls under the City of San Clemente so we do not have an estimated timeframe but that will not occur until this project is concluded.

ORANGE – The Orange County Transportation Authority today finalized a contract with a geo-technical firm to begin emergency work to stabilize the railroad track through southern San Clemente – work tentatively scheduled to begin next week.

Check out these tips from the City of San Clemente for safe and enjoyable travel along the San Clemente Beach Trail. For your safety, remember to stay on the trail at all times and avoid trespassing on the OCTA-owned rail corridor, which runs parallel to the beach. Please cross the tracks only at designated crossings.

California Transportation Commission funds come in addition to previous $2 million for cleanup; San Clemente slope continues to be monitored as freight trains resume overnight trips ORANGE – The California Transportation Commission (CTC) on Friday awarded $7.2 million to the Orange County Transportation Authority for a construction project to help restore a critical link in Southern ...

In accordance with the Orange County Transportation Authority (OCTA) Pedestrian Action Plan, this checklist has been developed to ensure consideration of complete streets accommodations in projects, and is required for completion by OCTA project managers at initiation of key project phases.

ORANGE – Passenger rail service, including Metrolink and Amtrak Pacific Surfliner, is scheduled to fully and safely resume through South Orange County on Saturday, June 7, following the planned completion of construction of the initial phase of emergency efforts to reinforce the most vulnerable areas along the rail line in San Clemente.

Over the past three years, San Clemente’s eroding bluffs – on both city and private property – have repeatedly forced the closure of the rail line which has operated largely uninterrupted for more than 125 years.

Bicycles require a paid Amtrak ticket reservation on Amtrak Pacific Surfliner trains.

Pasos Peatonales San Clemente OCTA, la ciudad de San Clemente y Metrolink están trabajando cooperativamente en la construcción de mejoras de seguridad en siete cruces ferroviarios para peatones a lo largo del sendero de la playa.