Skip to main content

The Measure M2 Ordinance No. 3 requires that all local jurisdictions annually satisfy specific eligibility requirements to receive Measure M2 net revenues. As part of this requirement, the pavement management plans and expenditure reports were submitted to the Orange County Transportation Authority by the local jurisdictions. Board of Directors’ approval is requested to find 33 of Orange ...

September 17, 2024 Active Transportation Update Overview 2 • Ongoing Projects • Safe Routes to School Program • OCTA Coordination OC Connect 3

Overview The Orange County Transportation Authority provides competitive grants to local jurisdictions and non-profit agencies beyond those provided through Measure M2 using various federal, state, and local transportation funding programs. The Orange County Transportation Authority also directly applies for federal, state, and local competitive grant programs to support Orange County ...

1.1 INTRODUCTION The purpose of this Project is for the Orange County Transportation Authority (Authority) to construct and operate a compressed natural gas (CNG) Facility (Facility) at the existing Irvine Sand Canyon Bus Base (Base). This Facility is necessary to fuel a new generation of CNG powered buses that will eventually replace the Authority’s existing diesel buses. This Initial Study ...

Integrated Approach Join fixed-route and paratransit with Measure M2 projects Transit Initiatives Go Local

Bids will be publicly opened at 11:00 a.m. on October 3, 2024. Bidders have the option to attend the onsite bid opening in Conference Room 101 at the Authority’s administrative office located at 600 South Main Street, Orange, CA 92688, or call-in using the following credentials:

Line Factor Fractional percent of 1-yr, I-hr event peak flowrate treated by the BMP(s) Fractional percent of 85th percentile, 24-hr design event that is treated by the BMP(s) BMP Multiplier: points if BMP is not low-impact development (LID) or treatment control .1/3 point for high capacity systems .2/3 point for filters/biofilters .1 point for zero-discharge BMPs Points Multiplier Available ...

• The OC Loop is a vision for 66 miles of seamless connections and an opportunity for people to bike, walk, and connect to some of California’s most scenic beaches and inland reaches.