Skip to main content

The 2045 Core Elements are South Orange County projects that have not yet started construction in 2022 but are funded or committed to be implemented by 2045. As these projects are in the pipeline for delivery, the 2022 transportation network along with the 2045 Core Elements form the 2045 Baseline scenario for future conditions analysis.

Background The primary goal of these guidelines is to ensure consistent field data collection and reporting procedures so that countywide funding allocations can be based on agency comparable pavement conditions.

Passenger rail service was stopped through south San Clemente in late September out of an abundance of caution and to allow for the emergency repairs after the track was found to have moved more than 2 feet between September 2021 and September 2022. The track movement was caused by the gradually sliding hillside next to the track, as well as storm surge and sand erosion. With partial funding ...

About This Report The Orange County Transportation Authority (OCTA) operates a countywide network of 58 routes including local, community, rail connector, and express bus routes serving over 5,000 bus stops known as OC Bus. OCTA also operates paratransit service (OC ACCESS), a shared-ride program available for people unable to use the standard OC Bus service because of functional limitations ...

Date Posted: 9/8/2022 Closing Date: 10/5/2022 2:00:00 PM Award Date: 1/12/2023 Contract Administrator:

Huntington Beach to Los Angeles Express via 405 Fwy / 605 Fwy / 105 Fwy / 110 Fwy

Assembly Bill (AB) 2097 (2022) is an existing policy that supports this shift. To maximize effectiveness, local jurisdictions could focus their parking management efforts on: • High-density areas with strong transit connections for pilot parking management programs.

Recommendations Approve the proposed Orange County Transportation Authority Internal Audit Department Fiscal Year 2024-25 Internal Audit Plan.

The Measure M2 Ordinance No. 3 requires that all local jurisdictions satisfy eligibility requirements on a cyclical basisin order to receive Measure M2 net revenues. The Annual Eligibility Review Subcommittee has convened and completed its review of the required eligibility items that were duethis eligibility cycle. The eligibility items are presented for the Taxpayer Oversight Committee ...

2022 Plug-in Electric Buses Begin Operation Plug-in battery electric buses begin operating as part of a pilot program that also includes 10 previously deployed hydrogen fuel-cell electric buses.