Skip to main content

OCTA and Metrolink to begin emergency work Monday April 28 The Orange County Transportation Authority, in coordination with Metrolink, is taking

“Dredging and Placement of Sand for the Coastal Rail Stabilization Priority Projects” All: This letter and its Attachments comprise Addendum No. 1 to the above captioned Request for Information issued by the Orange County Transportation Authority (“Authority”). 1.

operations, including a detailed analysis of 7 miles of critical coastal track between Dana Point and San Clemente at the San Diego County line. The objective of this short-to medium-term study is to ensure uninterrupted rail operations for the next 30 years. • The second study will look longer term at a potential rail line

Coastal erosion is threatening south Orange County’s coastline, and the e˜ects have become more severe in recent years. The railroad track, homes along the coast, and recreational facilities on the beaches are facing increased risk. Passenger rail service

• Coastal Development Permit (CDP) approved by the California Coastal Commission (CCC) on May 7, 2025 • Pre-proposal meeting with design-build contractor, proposal due May 7, 2025 • Preparing cooperative agreement with SCRRA for construction support for Area 3 • Funding allocation scheduled for California Transportation Commission ...

Company Name: FERREIRA COASTAL CONSTRUCTION
Contact: DEREK RIESBERG
Address: 10370 COMMERCE CENTER DRIVE, S, RANCHO CUCAMONGA, CA 91730
Phone: (909) 2571137
Email: DRIESBERG@FERREIRACONSTRUCTION.COM: Electrical Installation: driesberg@ferreiraconstruction.com

Descripción general del proyecto . Como parte de Estudio de resiliencia del ferrocarril costeroOCTA completó una evaluación inicial que identificó cuatro áreas que requieren acción inmediata para garantizar operaciones ferroviarias seguras e ininterrumpidas a través de San Clemente.. Es necesario tomar medidas de emergencia para abordar las amenazas urgentes que plantea la erosión de ...

• California Coastal Commission (CCC) approved culvert repair and reapportionment of riprap repairs between Areas 1and 2 (Area 1A) • Work remains on schedule to be completed by June 9, 2025 • Regular construction coordination meetings are taking place with the Southern California Regional Rail Authority (SCRRA) and City of San Clemente (City)

operations, including a detailed analysis of 7 miles of critical coastal track between Dana Point and San Clemente at the San Diego County line. The objective of this short-to medium-term study is to ensure uninterrupted rail operations for the next 30 years. • The second study will look longer term at a potential rail line

Follows the coastal route all the way to Dana Point. Quaint shops, restaurants, art galleries and events are some of the major attractions. Newport Beach/Balboa Peninsula Travels the peninsula to the Balboa Fun Zone with plenty of stops along the way for beach, food and fun. San Clemente