contractors are required to demobilize from the creek, crews are expected to work continuously Monday through Saturday, excluding Sunday, beginning as soon as Monday, Aug. 26. During this time, neighboring residents may experience noise from
scope of work is sufficiently funded to accomplish the tasks being requested or level of effort. 2. Departments shall obtain such estimates from sources, including but not limited to, published competitive prices, results of competitive procurements or estimates by Project Managers.
a. I live and work in OC / Vivo y trabajo en OC. b. I live in OC, but work outside of OC / Vivo en OC, pero trabajo fuera de OC. c. I live outside of OC, but work in OC / Vivo fuera de OC, pero trabajo en OC. d. I don’t live or work in OC, but visit OC / No vivo ni trabajo en OC, pero visito OC. Marissa
Nighttime work on this particular stretch of SR-91, between SR-241 and SR-71, will be ongoing through the end of 2010. CLOSURES/DETOURS: Location Date and Time Suggested Detour Eastbound SR-91 Connector to Northbound SR-71 Mon. 6/14 through Fri. 6/18 and Mon. 6/21 through Fri. 6/25
The Orange County Transportation Authority invites sealed bids for Construction of the Metrolink Parking Structure at the Orange Transportation Center
"Report Created 6/6/2025 5:30:31 PM",,, "PLANHOLDERS LIST",,, "SOLICITATION 53922: Installation of Battery Electric Bus Chargers and Electrical Infrastructure at ...
Orange County Transportation Authority 550 South Main Street / P.O. Box 14184 / Orange/ California 92863-1584 / (714) 560-OCTA (6282) July12, 2023
the required work by reasons of: experience in performing work of a similar nature; demonstrated competence in the services to be provided; strength and stability of the firm; staffing capability; work load; record of meeting schedules on similar projects; and supportive client references. The proposal shall not exceed twenty (20) pages, excluding
Continue to work with regional partners Consensus on priority corridors (Early 2017) Initiate PSRs/Corridor Studies (Late 2017) Planning Studies Project Initiation Project Approval / Environmental Document (PA/ED) Plans, Specifications, & Estimates (PS&E), and Right of Way Construction
Preparation work for track installation will require a full closure of the north side of W. Santa Ana Boulevard, eastbound traffic will be shifted to the south side of W. Santa Ana Boulevard. Westbound traffic will be detoured north or south at Bristol Street. Additionally, a parking closure on the north side of W. Santa Ana Boulevard will