About the Project The Orange County Transportation Authority (OCTA), in coordination with Metrolink, is replacing the railroad bridge over San Juan Creek in the City of San Juan Capistrano to enhance safety and reduce maintenance needs. Once the new bridge is completed and train service is switched over, the existing bridge will be demolished. Construction is expected to be completed in early ...
EVENT HIGHLIGHTS Enjoy games, goodies, prizes and more! Meet the OC Fair Mascots and take pictures at the photo booth Play Plinko to win fun prizes Fun crafts and activities for the kids Fuel up with snacks and beverages before heading off to the fair Ride stress free on the OC Fair Express for just $2 each way and kids 18 and under ride free! Then catch the 10:35 a.m. OC Fair Express to ...
Examples of ineligible expenditures: hazardous waste dump fees, NPDES permit fees, public parking lot materials/machine maintenance, crossing guard services, park maintenance and supplies, indirect and/or overhead costs not supported by a documented, current plan (< 5 years old) representing a reasonable methodology.
In addition, the California Coastal Commission last week approved a request for a Coastal Development Permit to construct a catchment wall at Mariposa Point and restore the pedestrian trail. The 1,400-foot-long catchment wall will help protect the rail line from sliding debris from the privately owned hillside above the track.
In addition, Johnson joined other OCTA leaders including Regional Rail Department Manager Kelly Hart, Chief Operating Officer Johnny Dunning, Jr., and Director of Maintenance Cliff Thorne in a panel that showcased how some of OCTA’s forward-thinking transportation projects are redefining mobility and connectivity across the region.
About the Project The Orange County Transportation Authority (OCTA), in coordination with Metrolink, is replacing the railroad bridge over San Juan Creek in the City of San Juan Capistrano to enhance safety and reduce maintenance needs. Once the new bridge is completed and train service is switched over, the existing bridge will be demolished. Construction is expected to be completed in 2026.
Routes (2018-2019) Analyze Regional Bus-Rail Connections as Part of Upcoming Los Angeles–Orange County Transportation Study (2018-2019) Conduct Transit Corridor Study of Bristol Street from Initial OC Streetcar Alignment to South Coast Metro Area (2018-2020) Implement Beach Boulevard Rapid Bus (2019) Expand OC Flex (2019, pending successful ...
Now, new railroad crossing safety enhancements at the Palisades Drive / Beach Road railroad crossing in Dana Point from late 2011 have allowed the city to officially apply for quiet zone status with the Federal Railroad Administration.
Tell me about the architecture! If you’re a history buff, take this architecture tour. It provides more details about 25 historic buildings such as: Santora Building Grand Central Market Minter House West End Theater Masonic Temple Old Orange County Courthouse Howe-Waffle House Old Santa Ana City Hall W.H. Spurgeon Building Getting here Most spots are under a half-mile walk from the Broadway ...