Estatal de California en Fullerton a las 6:55 a. m., 7:25 a. m. y 7:55 a. m. para que coincidan con los trenes de Metrolink 703, 604 y 705. Ruta 37: Domingos: Se agregarán dos nuevos viajes por la mañana: uno hacia el norte a las 6:15 am y otro hacia el sur a las 6:05 am. Ruta 47: Entre semana: Se ajustarán los horarios de los viajes
Listed to the right is a list of users who have downloaded the selected solicitation.
The Orange County Transportation Authority invites proposals from qualified consultants to provide an Enterprise Asset Management system.
13 2025 FTIP Adoption Schedule The 2023 FTIP cycle will still be ongoing while the 2025 FTIP is being approved Amendments will still need to be submitted if there are project changes Tentative Schedule September 25 - October 5, 2023 Optional meetings with OCTA for questions
Keeping Orange County moving safely - Orange County Transportation ...
1/5/2017 12:00:00 AM (PST) Contract Administrator: Iris Deneau. Phone Number: (714) 560-5786. E-Mail: ideneau@octa.net . Category: Prime Contractors Sub Contractors Not Participating . This solicitation has not been downloaded yet. [Header:Prime Contractors] Needed Services Contact Instructions ...
Construction is underway and generally occurs Monday through Friday, from 6 a.m. to 4 p.m. Center Median Reconstruction. Nighttime work for the reconstruction of the center median that is east of the Coyote Creek Channel is expected to continue through the end of August. Crews will continue to perform structural excavation as well as electrical ...
SOLICITATION 53961: Construction Management Services for Interstate 5 Improvement Project between Interstate 405 and Yale Avenue
Consultant to provide Preliminary Engineering and Environmental Services for the Irvine Station Improvement Project
form.Upon submission of your registration form you will receive one (1) entry into the Sweepstakes. Limit: One entry. Drawings: OCTA will randomly select the potential winners from all eligible Sweepstakesentries received by the time of the drawings. Ten (10) winners will be randomly selected at the conclusion of the campaign.