Jamboree Road - Tustin Ranch Road to north city limits

Project at a Glance
Jamboree Road - Tustin Ranch Road to north city limits

Status: Pending bid / contract award

Start Date:
August 1, 2009

Estimated Completion Date:
February 1, 2010

City of Tustin
Eric Johnson, Project Manager
714.573.3300

The purpose of this project is to rehabilitate the existing roadway on a segment of Jamboree Road between 2,750 feet north of Tustin Ranch Road and north City Limits. All work will occur within the existing City right-of-way and will be confined to previously paved areas within the project limits.

The project includes:

  • for excavation of deteriorated pavement
  • construction of a new asphalt concrete base course with an asphalt rubber hot mix (ARHM) wearing surface
  • repair/replacement of damaged curb & gutter and sidewalks
  • replacement of existing curb ramps to be in compliance with current ADA requirements
  • replacement of detector loops
  • replacement of striping and pavement markings
  • adjustment of manhole rims and valve boxes to grade
  • repairs and modifications to existing median island irrigation system to minimize water usage, overspray, and runoff.