Project at a Glance

$1.2 million (33 jobs)

Status: In progress

Anticipated Start: Current

Anticipated Completion:

Employment Opportunities
EDD

Procurement Opportunities
Engineering




Image Gallery

Metrolink positive train control
Orange County's share

In Los Angeles, the Southern California Regional Rail Authority (SCRRA) is developing an accelerated strategy to have Positive Train Control (PTC) operational on all Metrolink train equipment by 2012, in conjunction with the BNSF and UP freight railroads’ goal to complete the installation of wayside PTC equipment along their rights-of-way in Southern California by 2012.

Metrolink’s objective is to have the full PTC system in place on its operating properties well in advance of the 2015 federal mandate.

OCTA is participating through the standard all share cost sharing allocation, as one of the five member agencies of SCRRA.