  • Lakeview Overcrossing

    Project Contacts 1 of 1

    Lakeview Avenue Overcrossing Project opens to traffic June 6.

    The Lakeview Avenue Overcrossing opened to motorists on Tuesday, June 6. This new bridge allows drivers to travel over the BNSF Railway tracks for improved safety and time savings.

    As always, please drive carefully while new traffic patterns are established. There may be some intermittent work over the next several weeks, so please be cautious when work crews are present.

    OCTA reconstructed Lakeview Avenue as an overcrossing to allow vehicles to pass over the BNSF Railway tracks. Lakeview Avenue was elevated and realigned to separate car traffic from train traffic. The overpass was built between south of Orchard Drive to the north and south of Eisenhower Circle to the south.

    A ramp connecting Lakeview Avenue to Orangethorpe Avenue was also constructed, and North Bubach Street on the northeast corner of the project area was rerouted to connect to the new Connector Road with a new signalized intersection. In addition, a new frontage road was built at the southeast corner of the project for local business access and a new road also was built at the southwest corner, which connects the new frontage road to Lakeview Avenue.

    Project Benefits

    • Greater Driver/Pedestrian Safety
    • Shorter Emergency Response Times
    • Elimination of Delays
    • Easier Business Access
    • Enhanced Economic Vitality
    • Improved Air/Noise Conditions
    • Better Quality of Life


    Lakeview Overcrossing New Loop Road
    Overview

    Lakeview Avenue Overcrossing Project opens to traffic June 6.

    The Lakeview Avenue Overcrossing opened to motorists on Tuesday, June 6. This new bridge allows drivers to travel over the BNSF Railway tracks for improved safety and time savings.

    As always, please drive carefully while new traffic patterns are established. There may be some intermittent work over the next several weeks, so please be cautious when work crews are present.

    OCTA reconstructed Lakeview Avenue as an overcrossing to allow vehicles to pass over the BNSF Railway tracks. Lakeview Avenue was elevated and realigned to separate car traffic from train traffic. The overpass was built between south of Orchard Drive to the north and south of Eisenhower Circle to the south.

    A ramp connecting Lakeview Avenue to Orangethorpe Avenue was also constructed, and North Bubach Street on the northeast corner of the project area was rerouted to connect to the new Connector Road with a new signalized intersection. In addition, a new frontage road was built at the southeast corner of the project for local business access and a new road also was built at the southwest corner, which connects the new frontage road to Lakeview Avenue.

    Project Benefits

    • Greater Driver/Pedestrian Safety
    • Shorter Emergency Response Times
    • Elimination of Delays
    • Easier Business Access
    • Enhanced Economic Vitality
    • Improved Air/Noise Conditions
    • Better Quality of Life


    Details
    Detours
    Lakeview Overcrossing New Loop Road
    Gallery
    Stay Informed

Overview Tab Content:

Details Tab Content:

Detours Tab Content:

Stay Informed Form (defined by 'ekfrm' parameter in URL):

OC Bridges - Get Connected/Stay Connected

 * Name:  
 * E-Mail:  
 * Telephone:  
 * Address:  
 * City:  
 * State:  
 * Zip Code:  

I prefer to receive information via: Automated Call System E-mail

I would like to:  
  Receive updates about construction activity
  Have a representative of the OC Bridges Program speak to my organization.
Comments:    
* = required field

Note: Notifications are sent by email and or automated call system. For questions, please call Tresa Oliveri at 714-560-5374.

Get Connected